-
News A pure experience of fire
The new electric fireplaces from Element4!
The Element4 range of electric fireplaces is being expanded and we would like to introduce the 4 latest additions here
Read article -
News Even more environmentally friendly heating with Rüegg Violino Tunnel
Rüegg Violino tunnel 55x98 and 45x80 with catalytic converter
The Violino Tunnel 55x98 and the Violino Tunnel 45x80 are the first fireplaces from Rüegg to be launched with a catalytic converter.
Read article -
Another innovation from Rüegg:
New plug-in panel for the Violino and Violino Tunnel
An attractively priced alternative to our mounting and cover frames.
Read article -
Milestones
From Zumikon all around the world
In a village near Zurich in 1955 began a story which is still a success today and which is carried forward by Walter Rüegg’s sons.
Read article
-
News Another fantastic event!
Rüegg partner event in Austria
The partner event for our German and Austrian partners! Uncertain for a long time due to the current weather situation.
Read article -
News Proven design – new fuel:
The Bioethanol Fireplace from Element4
Proven design – new fuel: The Bioethanol Fireplace from Element4
Read article
. -
28.2-2.3.2024 Progetto Fuoco
Ruegg visited the Progetto Fuoco Trade Fair in Verona
From February 28 to March 2, the largest trade fair for fireboxes took place in Verona, Italy.
Read article
. -
The winners
Rüegg PHOTO AWARD'22
The 12 winners of the Rüegg PHOTO AWARD 2020 are known. Congratulations!
Read article
-
News Two fantastic events!
Event for Rüegg partners in Switzerland and Italy
This time, the events for Swiss partners took place in Thun. The Italian and Ticino partners were invited to Concorezzo in Italy.
Read article -
News Even more environmentally friendly heating with Rüegg Violino Tunnel
Rüegg Violino tunnel 55x73 with catalytic converter
The Violino Tunnel 55x73 with catalytic converter achieves an impressive nominal heat output
Read article -
The winners
Rüegg PHOTO AWARD'24
The 12 winners of the Rüegg PHOTO AWARD 2024 are known. Congratulations!
Read article
-
News News from our company
Reduction in emissions with Rüegg catalytic converters
Sustainability and the release of emissions into the environment are important issues in our industry.
Read article -
Now even easier!
Cover frame with the preparation for a chimney damper control now available!
All our cover frames are now equipped with the preparation for a chimney damper control.
Read article -
April 23 and 24, 2024
Service training course for stove builders in Hinwil
The invitation to a service training course for stove builders has once again been met with great interest.
Read article